Düsseldorf future factory · robot cells and driverless transport

A modern factory as a model: robot cells, driverless transport vehicles, drones and a robot dog, plus people on the assembly line and a plant tour in ten stops.

Trailer

Real are location, terrain and surroundings (official NRW elevation data, OpenStreetMap). Halls and processes are an interpretation of our own based on public reports; quantities, processes and times are model values. With your data, the model shows your site and your processes.

The Düsseldorf future factory is a modern van factory as a block model: twelve robot cells with four large robot arms each weld the body shells. Every body shell rides a driverless transport vehicle from cell to cell, drones fly inspection rounds, a robot dog patrols – and people work on the assembly line. Small robots, so-called cobots, fit the windows.

Five controls steer the plant: investment (one to three lines), skilled workers, supply, quality and market. A plant tour with ten stops shows delivery, cells, paint, assembly, testing and the yard. If there are too few driverless transport vehicles it gets tight, because every body shell needs one; if the yard is full, the car transporter waits.

Real are location, terrain and surroundings in Düsseldorf from official NRW elevation data and OpenStreetMap. Halls and processes are an interpretation of our own based on public reports; quantities, processes and times are model values, and one working day lasts ten seconds. The page is for museums and exhibitions, schools and universities, training and further education.

Factory tour (10 stops)

  1. 01

    Delivery

  2. 02

    Body shop · robot cells

  3. 03

    Body shop · inside a cell

  4. 04

    Paint shop

  5. 05

    Assembly · on the line

  6. 06

    Assembly · marriage

  7. 07

    Assembly · glass and cobots

  8. 08

    Logistics

  9. 09

    Inspection

  10. 10

    Yard · car transporter

A site at work

01

A site at work

Düsseldorf future factory: A modern van factory in Düsseldorf: robot arms weld in cells, each body rides on a driverless vehicle, people work on the line.

Delivery

02

Delivery

Delivery – Pressed parts arrive from other plants: floors, side panels, roofs, doors. Forklifts bring them to the cells in racks.

What is shown – why – for whom

What is shown Why For whom
Delivery with pressed parts from other plants WhyShows how floors, side walls, roofs and doors reach the cells in racks. For whommuseum, teaching
Twelve robot cells with four robot arms each and driverless transport vehicles WhyShows how the body shell travels from cell to cell and is welded. For whomteaching, history of technology
Paint shop with dip tank, filler, colour, clear coat and dryer WhyShows how paint robots work in the booths. For whommuseum, teaching
Assembly line, marriage, windows with cobots and logistics WhyShows where people work and how driverless vehicles bring the parts. For whommuseum, exhibition
Testing with light tunnel and drones WhyShows how paint, gaps and lights of every van are checked. For whomteaching, industrial heritage
Yard with car transporters, gate, canteen and robot dog WhyShows how finished vans, eight per truck, leave the plant and who comes through the gate. For whomexhibition, career guidance
Five controls with output, stockpile and daily result WhyShows connections in operations, not operating figures. For whomeconomics teaching
Body shop · inside a cell

03

Body shop · inside a cell

Body shop · inside a cell – The clamping frame holds the panels while the arms weld from all sides. Next to the cell: parts rack, control cabinet and a light curtain that stops the robots if anyone steps in.

Five levers, one works

04

Five levers, one works

Full investment – three lines: further line halls on the north site with body shop, paint, assembly and testing.

Films from the model

  • Above Düsseldorf future factory

    A flight across the whole site: low approach, the production line, then across the works to the long shot – everything moving, with the sound of the works.

  • Through the halls

    The factory tour glides low through the halls: from delivery through the robot cells and the paint shop to the marriage, inspection and the yard.

  • A working day in time-lapse

    In time-lapse working days pass in seconds: shifts at the gate, traffic on the supply and dispatch routes, the stockpile (yard of finished vehicles) changing along.

  • A works grows

    Investment step by step: new lines appear, the workforce grows with them, then more supply and a boom in the market.

  • Bottleneck – the works respond

    First materials run short and the plant only runs in part, then the market takes too little and the stockpile fills up – in the boom the works recover.

  • Using the software

    With the full interface: the works with five levers, slump and boom, one hall and the factory tour through the halls.

Facilities and areas in the model

  • Delivery

    Pressed parts arrive from other plants: floors, side panels, roofs, doors. Forklifts bring them to the cells in racks.

  • Robot cells

    Twelve cells with four large robot arms each weld the body. Every body rides on a driverless transport vehicle from cell to cell.

  • Paint shop

    Dip bath, primer, colour, clear coat, oven – paint robots in the booths.

  • Assembly

    People work on the line: wiring, cockpit, seats. Small robots fit the glass. Driverless vehicles bring parts from logistics.

  • Inspection

    A light tunnel and drones check every van: paint, gaps, lights. Whatever is wrong goes to rework.

  • Yard · trucks

    Finished vans wait on the yard and drive onto the car transporter – eight per truck. When it is full it leaves.

  • Logistics

    Trucks bring parts to logistics; driverless vehicles take them on to assembly.

  • Gate · canteen

    The shifts come through the gate; the canteen feeds the workforce. A robot dog patrols the body shop.

When things get tight

05

When things get tight

Yard of finished vehicles filling up – more is made than sold; when there is no room left the surplus goes at a 40 % discount.

Medium long shot

06

Medium long shot

Medium long shot – the production line: robot arms weld in cells, driverless vehicles carry the bodies.

Processes in the model

Factory tour (10 stops)

  1. 01Delivery
  2. 02Body shop · robot cells
  3. 03Body shop · inside a cell
  4. 04Paint shop
  5. 05Assembly · on the line
  6. 06Assembly · marriage
  7. 07Assembly · glass and cobots
  8. 08Logistics
  9. 09Inspection
  10. 10Yard · car transporter

From pressed parts to the van

  1. 01Delivery
  2. 02Robot cells
  3. 03Paint shop
  4. 04Assembly
  5. 05Inspection
  6. 06Yard · trucks

Expansion

  1. 01investment: further line halls on the north site
  2. 02body shop, paint, assembly and testing on each line
  3. 03set the workforce to match
  4. 04the yard in the north-east shows what is not sold

Bottleneck and recovery

  1. 01supply short – the store empties
  2. 02materials missing – the plants only run in part
  3. 03market in a slump – the stockpile grows until the fire sale
  4. 04boom – the stockpile empties, the result rises

What the model can be used for

  • Museum and exhibition

    The plant tour shows the way in ten stops: delivery, robot cells, a single cell, paint shop, assembly line, marriage, windows and cobots, logistics, testing and yard.

    For whommuseums, visitor centres, exhibitions

  • School and university

    What do robot cells do in body construction, and what are driverless transport vehicles for? Terms like cobot, light tunnel and andon board sit where they belong.

    For whomschools, universities, vocational training

  • Humans and machines

    Where do people still work in an automated factory? On the line they fit cables, cockpit and seats while robots weld, paint and inspect. The model shows both side by side.

    For whomcareer guidance, further training, economics teaching

  • Understanding operations

    Investment, skilled workers, supply, quality and market act at once on output, stockpile and result. It becomes visible why too few driverless vehicles slow down the whole line.

    For whomeconomics teaching, further training

Body shop · robot cells

07

Body shop · robot cells

Body shop · robot cells – Twelve cells in four rows, each with four large robot arms. Every body rides on a driverless transport vehicle from cell to cell. Green light: cell active.

The whole software

08

The whole software

Running the works – five levers: investment, workforce, supply, quality and market; the chain shows at once what follows.

What you can change

Controls

  • Investment: Number of lines (1 to 3): more money builds more, less shuts them down; without more people they only run in part.
  • Workforce: Enough people for all lines – output rises, and so does success. Too many people cost wages without more output.
  • Supply: More material arrives – the plant no longer has to wait. Levels short, normal and double; supply security costs money.
  • Quality: More quality means less scrap and fewer breakdowns but costs testing and maintenance (levels low, normal, high).
  • Market: Slump, normal or boom. In a slump more is made than sold: the stockpile grows and success drops. In a boom the market takes more: the stockpile empties and success rises.

Disruptions

  • Too few people: Workers are missing, part of the plant stands still.
  • Material missing: Supply is not enough; once the store is empty the plants only run in part (message: “Parts store empty – supply is short”).
  • Too much built: More is made than the market takes: the stockpile grows; when it is full the surplus goes at a 40 % discount (message: “Stockpile full – fire sale at a discount”).
  • Market wants more: Demand is greater than the works can make; once the stockpile is empty orders are lost (message: “Stockpile empty – orders are lost”).
  • Bottleneck: Assembly: Parts missing.
  • Bottleneck: Yard full: The car transporter is away.
  • Bottleneck: Too few driverless transport vehicles: Every body needs one. More AGVs!

What the model brings

  • 01

    The real terrain as a stage

    Plant, tracks and surroundings stand on terrain from official elevation data. You show the site as it lies, not as a diagram.

  • 02

    A body shell on its way

    The ten-stop plant tour follows the path of the body shell. You understand the process before you steer the plant yourself.

  • 03

    Bottlenecks without damage

    Parts run short in assembly, the yard is full, there are too few driverless vehicles. You see where it gets tight first, and set it back.

  • 04

    For big screens and the browser

    Runs in the browser and on large projections. A working day in fast motion lasts ten seconds.

  • Düsseldorf future factory: A modern van factory in Düsseldorf: robot arms weld in cells, each body rides on a driverless vehicle, people work on the line.
    Düsseldorf future factory: A modern van factory in Düsseldorf: robot arms weld in cells, each body rides on a driverless vehicle, people work on the line.
  • Düsseldorf future factory from the other side – the same site in the afternoon sun from the south-west, with long shadows of halls and structures.
    Düsseldorf future factory from the other side – the same site in the afternoon sun from the south-west, with long shadows of halls and structures.
  • Medium long shot – the production line: robot arms weld in cells, driverless vehicles carry the bodies.
    Medium long shot – the production line: robot arms weld in cells, driverless vehicles carry the bodies.
  • Far out near Düsseldorf – terrain, houses and trees come from official elevation data; at the edge the world fades softly into the dark.
    Far out near Düsseldorf – terrain, houses and trees come from official elevation data; at the edge the world fades softly into the dark.
  • From above – Düsseldorf future factory as a model of blocks: every cell a block, buildings and terrain from elevation data and OpenStreetMap.
    From above – Düsseldorf future factory as a model of blocks: every cell a block, buildings and terrain from elevation data and OpenStreetMap.
  • Düsseldorf future factory from above at an angle – Delivery, Robot cells, Paint shop, Assembly, Inspection, Yard · trucks at a glance.
    Düsseldorf future factory from above at an angle – Delivery, Robot cells, Paint shop, Assembly, Inspection, Yard · trucks at a glance.
  • All around Düsseldorf: streets, tracks and water from OpenStreetMap, houses and trees from the elevation data – only the plant in the middle is built specially.
    All around Düsseldorf: streets, tracks and water from OpenStreetMap, houses and trees from the elevation data – only the plant in the middle is built specially.
  • At eye level – the production line, as close as from the fence.
    At eye level – the production line, as close as from the fence.
  • Delivery – Pressed parts arrive from other plants: floors, side panels, roofs, doors. Forklifts bring them to the cells in racks.
    Delivery – Pressed parts arrive from other plants: floors, side panels, roofs, doors. Forklifts bring them to the cells in racks.
  • Robot cells – Twelve cells with four large robot arms each weld the body. Every body rides on a driverless transport vehicle from cell to cell.
    Robot cells – Twelve cells with four large robot arms each weld the body. Every body rides on a driverless transport vehicle from cell to cell.
  • Paint shop – Dip bath, primer, colour, clear coat, oven – paint robots in the booths.
    Paint shop – Dip bath, primer, colour, clear coat, oven – paint robots in the booths.
  • Assembly – People work on the line: wiring, cockpit, seats. Small robots fit the glass. Driverless vehicles bring parts from logistics.
    Assembly – People work on the line: wiring, cockpit, seats. Small robots fit the glass. Driverless vehicles bring parts from logistics.
  • Inspection – A light tunnel and drones check every van: paint, gaps, lights. Whatever is wrong goes to rework.
    Inspection – A light tunnel and drones check every van: paint, gaps, lights. Whatever is wrong goes to rework.
  • Yard · trucks – Finished vans wait on the yard and drive onto the car transporter – eight per truck. When it is full it leaves.
    Yard · trucks – Finished vans wait on the yard and drive onto the car transporter – eight per truck. When it is full it leaves.
  • Logistics – Trucks bring parts to logistics; driverless vehicles take them on to assembly.
    Logistics – Trucks bring parts to logistics; driverless vehicles take them on to assembly.
  • Gate · canteen – The shifts come through the gate; the canteen feeds the workforce. A robot dog patrols the body shop.
    Gate · canteen – The shifts come through the gate; the canteen feeds the workforce. A robot dog patrols the body shop.
  • Robot cells close up – robot arms weld in cells, driverless vehicles carry the bodies.
    Robot cells close up – robot arms weld in cells, driverless vehicles carry the bodies.
  • Assembly close up – people on the line, the bodies move on in rhythm.
    Assembly close up – people on the line, the bodies move on in rhythm.
  • Delivery – Pressed parts arrive in racks from other plants. Forklifts bring them to the robot cells.
    Delivery – Pressed parts arrive in racks from other plants. Forklifts bring them to the robot cells.
  • Body shop · robot cells – Twelve cells in four rows, each with four large robot arms. Every body rides on a driverless transport vehicle from cell to cell. Green light: cell active.
    Body shop · robot cells – Twelve cells in four rows, each with four large robot arms. Every body rides on a driverless transport vehicle from cell to cell. Green light: cell active.
  • Body shop · inside a cell – The clamping frame holds the panels while the arms weld from all sides. Next to the cell: parts rack, control cabinet and a light curtain that stops the robots if anyone steps in.
    Body shop · inside a cell – The clamping frame holds the panels while the arms weld from all sides. Next to the cell: parts rack, control cabinet and a light curtain that stops the robots if anyone steps in.
  • Paint shop – From AGV onto the skid: dip tanks against rust, oven, then the booths with paint robots – primer, base coat, clear coat – and the dryer.
    Paint shop – From AGV onto the skid: dip tanks against rust, oven, then the booths with paint robots – primer, base coat, clear coat – and the dryer.
  • Assembly · on the line – This is where most people work. The lift table on the AGV raises the van to working height. Racks of parts and screens showing the next task stand right at the line.
    Assembly · on the line – This is where most people work. The lift table on the AGV raises the van to working height. Racks of parts and screens showing the next task stand right at the line.
  • Assembly · marriage – The lift table lowers and the drivetrain comes from below – for the electric van, the battery. Then it gets its wheels.
    Assembly · marriage – The lift table lowers and the drivetrain comes from below – for the electric van, the battery. Then it gets its wheels.
  • Inspection – Light tunnel for the paint, rolling road, rain booth. Drones fly inspection rounds over the hall.
    Inspection – Light tunnel for the paint, rolling road, rain booth. Drones fly inspection rounds over the hall.
  • Yard · car transporter – Finished vans wait on the yard and drive onto the car transporter, eight per truck.
    Yard · car transporter – Finished vans wait on the yard and drive onto the car transporter, eight per truck.
  • Small investment – only line 1 runs, the other plots lie ready as marked foundations.
    Small investment – only line 1 runs, the other plots lie ready as marked foundations.
  • Full investment – three lines: further line halls on the north site with body shop, paint, assembly and testing.
    Full investment – three lines: further line halls on the north site with body shop, paint, assembly and testing.
  • Every facility labelled – the halls from delivery to dispatch; at the top the working day with the daily output, on the right success in one number.
    Every facility labelled – the halls from delivery to dispatch; at the top the working day with the daily output, on the right success in one number.
  • The production line labelled – name and number right in the picture.
    The production line labelled – name and number right in the picture.
  • Success in one number – 100 means it cannot get better in this market; below it the result per day, at the top the output per working day.
    Success in one number – 100 means it cannot get better in this market; below it the result per day, at the top the output per working day.
  • Where a lever acts, a ring lights up – here after a change in the market: Yard · trucks.
    Where a lever acts, a ring lights up – here after a change in the market: Yard · trucks.
  • Materials missing – supply is short, the store is empty: assembly slows down and bodies back up.
    Materials missing – supply is short, the store is empty: assembly slows down and bodies back up.
  • Yard of finished vehicles filling up – more is made than sold; when there is no room left the surplus goes at a 40 % discount.
    Yard of finished vehicles filling up – more is made than sold; when there is no room left the surplus goes at a 40 % discount.
  • Too few people – the workforce is not enough for all lines, part of the plant stands still.
    Too few people – the workforce is not enough for all lines, part of the plant stands still.
  • Boom – the market takes more than is being made: the stockpile empties, the dispatch route is busy.
    Boom – the market takes more than is being made: the stockpile empties, the dispatch route is busy.
  • The whole software – at the top the working day with clock and output, on the right success in one number, below the tiles for works and facilities.
    The whole software – at the top the working day with clock and output, on the right success in one number, below the tiles for works and facilities.
  • Running the works – five levers: investment, workforce, supply, quality and market; the chain shows at once what follows.
    Running the works – five levers: investment, workforce, supply, quality and market; the chain shows at once what follows.
  • One lever, visible at once – market set to slump: the status line explains the bottleneck, the stockpile grows, the daily result drops.
    One lever, visible at once – market set to slump: the status line explains the bottleneck, the stockpile grows, the daily result drops.
  • Hall card – Robot cells: what is there, how many people work there and the hall’s output.
    Hall card – Robot cells: what is there, how many people work there and the hall’s output.
  • Assembly card – the longest hall, people on the line and output in rhythm.
    Assembly card – the longest hall, people on the line and output in rhythm.
  • Factory tour – stop 6 of 10: Assembly · marriage; the camera glides low through the halls, one sentence per stop.
    Factory tour – stop 6 of 10: Assembly · marriage; the camera glides low through the halls, one sentence per stop.
  • Yard · trucks card – finished vehicles wait until the car transporter is full.
    Yard · trucks card – finished vehicles wait until the car transporter is full.
  • Bottleneck in orange – supply is not enough: the line at the top and the works status say in one sentence what is missing.
    Bottleneck in orange – supply is not enough: the line at the top and the works status say in one sentence what is missing.
  • The menu – overview and plant, cutaway, restart, demo, sound and other sites, below the controls for mouse, touch and keyboard.
    The menu – overview and plant, cutaway, restart, demo, sound and other sites, below the controls for mouse, touch and keyboard.
  • Sixteen real sites – blast furnaces, collieries, car plants, harbours and a shipyard, each where it really stands.
    Sixteen real sites – blast furnaces, collieries, car plants, harbours and a shipyard, each where it really stands.

Your site as a model

Would you like to show your plant, your museum or your industrial site like this? Write to us or call. We will send you the password for starting it on request.

Request the password if you are interested →

Ask about this

Minimal Factory: Zukunftsfabrik Düsseldorf · Roboterzellen und fahrerlose Transporte

What you enter goes to this site alone and serves only to answer you.

Basis and limits

Real are the location, terrain and buildings in Düsseldorf (official NRW elevation data and OpenStreetMap). The plant in the middle is our own simplified interpretation: quantities, processes, times and prices are model assumptions; the economy runs in time-lapse (10 seconds are one working day). Not a simulation of real operations and no cooperation with the site.

Public sources the model is based on:

  • Trade press, report on the site (31.01.2026)
  • Trade press, report on the site (2013)
  • Geobasis NRW: digital surface and terrain models DOM1/DGM1 (Data licence Germany – Zero – 2.0)
  • OpenStreetMap contributors (ODbL 1.0): streets, tracks, water, land use

More places in the model

← Minimal Factory

Real are location, terrain and surroundings (official NRW elevation data, OpenStreetMap). Halls and processes are an interpretation of our own based on public reports; quantities, processes and times are model values. With your data, the model shows your site and your processes.