Simulation · Minimal Organization · Logistics and transport

Container shipping line

A container line with its own terminal as a walkable model: gate, yard, stowage plan and quay cranes, timed by a fixed schedule.

Trailer

All data are fictional – NORDHAFT GRUPPE does not exist. The model can be fitted to your port's real data and filled with what few people see side by side today: ship arrivals and time at berth, or yard occupancy per block and hour.

The container terminal export process, as a running model. At the fictional NORDHAFT GRUPPE, ships sail to a fixed schedule, and the group's own terminal must bring every box to the right place at the right time. A forwarder books ten containers to Asia. They pass gate, yard, stowage planning and the ship-to-shore cranes one after another until they are on board. If the ship is full, the rest rolls over to the next one.

The site has nine buildings: the shipping line headquarters, two berths, container yards west and east, the gate, a rail terminal, the terminal control centre and an empty container depot. When delayed ships arrive bunched together, the berths and the yards fill up in plain view. More cranes per ship shorten time at berth but cost more; more block trains inland relieve the gate. Alongside, a ship calls at the port and an import container goes inland.

Three departures a week with fixed slots are a simplification. Documented in the sources: the terminal as a separate company, pilots as a public-law service, and release by customs. This page is for shipping line and terminal management, planning, sales, hinterland logistics and the port authority.

An export container goes on board

  1. 01

    Booking and rate: A forwarder books ten containers to Asia.

  2. 02

    Release empty container: Equipment releases empty containers at the depot.

  3. 03

    Loading at the shipper and export declaration run in parallel.

  4. 04

    Shipper loads, truck delivers: The shipper loads, trucks bring the containers.

  5. 05

    Export declaration to customs: Customs releases the goods for export.

  6. 06

    Containers here, customs done.

  7. 07

    Gate: entry: At the gate a camera reads the container number.

  8. 08

    Stacking in the yard: A gantry crane stacks the containers by ship and destination.

  9. 09

    Stowage plan: Stowage planning fixes where each box stands on board.

  10. 10

    Loading onto the ship: Ship-to-shore cranes load the ship. If it is full, the rest rolls to the next.

  11. 11

    Bill of lading: The bill of lading goes to the shipper.

  12. 12

    On board.

A site at work

01

A site at work

9 buildings, 16 departments, about 1,700 staff: in the evening light golden arcs show who reports to whom.

Every floor opened up

02

Every floor opened up

Every building can be opened, floor by floor – right into single rooms such as ‘Group board’, with workplaces and people at work.

What is shown – why – for whom

What is shown Why For whom
Diagram ‘Where the site gets tight’: berths, yard, gate WhyShows the pressure inside the terminal. For whomTerminal management, port authority
Diagram ‘The path across the site’: gate, yard, quay, rail terminal WhyShows the path of a container. For whomOnboarding, forwarders
Diagram ‘What each control does’: cranes, rail share, slots WhyRanks investments and contracts. For whomManagement, planning
Diagram ‘Year, week, day’: three departures a week WhyExplains the schedule as a rhythm. For whomSales, customers
Diagram ‘Where it gets tight’ when ships arrive bunched WhyShows the effects of delays. For whomBerth planning
Collaboration view between shipping line and terminal WhyShows two companies in one process. For whomManagement, supervisors
Process ‘An import container goes inland’ WhyShows truck versus rail. For whomHinterland logistics, local authorities
Who works with whom

03

Who works with whom

‘Berth and vessel planning’ with all 5 relations: Stowage planning and Network planning – and outside Port authority, Pilots' association and Tugs and mooring.

An export container goes on board

04

An export container goes on board

A single case can be followed – step by step, with the waiting time at every station. Target: loaded within 5 days of booking.

Films from the model

  • The tower opens up

    Just before sunset the floors drift apart – ‘Shipping line headquarters’ opens up as the camera rises and circles the building until night falls.

  • Who reports to whom, who works with whom

    Blue hour above the site: first the golden arcs of the structure, then the collaboration of the most connected department, finally the whole building.

  • A day in time-lapse

    From ten in the morning to midnight in 26 seconds: the sun moves, the windows light up, at night the data lines glow.

  • Surge and system outage

    In time-lapse: ‘Delayed ships arrive bunched’ brings more work, then ‘Terminal system fails’ – the data arcs turn red. The control ‘Slots per departure’ set to ‘large ship’ brings recovery.

  • Seven diagrams

    Calculated live from the model: ‘Who works with whom’, ‘Year, week, day’, ‘Management levels as a staircase’, ‘How a case flows’, ‘What each control does’, ‘What the work depends on’, ‘Where it gets tight’.

  • Using the software

    With the full interface: open a building, a department’s relations, ‘Delayed ships arrive bunched’, a control, diagrams with their panel, one case.

Departments in the model

  • Group board

    Leads the shipping line and the terminal company.

  • Network planning

    Sets services and rotations – the same departure every week.

  • Fleet management

    Own and chartered ships, bunkers, crew.

  • Sales and booking

    Sells slots and rates.

  • Documentation and customer service

    Bills of lading, arrival notices, release.

  • Equipment (empty containers)

    Brings empty boxes to where cargo is loaded.

  • Stowage planning

    Plans where every box stands on board: stability, dangerous goods, port order.

  • Dangerous goods and safety

    Checks dangerous goods declarations and safety rules.

  • Finance

    Freight, port dues, charter.

  • Terminal management (separate company)

    The terminal company also serves other lines – treated equally.

  • Berth and vessel planning

    Allocates berths and time windows.

  • Quay operations (ship-to-shore cranes)

    Discharges and loads ships around the clock.

  • Yard and horizontal transport

    Stacks containers and moves them between quay, yard and gate.

  • Gate

    Processes trucks: pre-notice, inspection, handover.

  • Rail terminal

    Loads block trains to the hinterland.

  • Engineering and terminal system

    Crane workshop and the terminal system that knows every box.

Terminal system fails

05

Terminal system fails

The data arcs turn red and work stalls – the simulation shows where cases pile up and how long recovery takes.

06

A day in 26 seconds

From ten in the morning to midnight in time-lapse: commuters, moving light, windows switching on – and at night the data lines.

All processes in the model

An export container goes on board

  1. 01Booking and rate: A forwarder books ten containers to Asia.
  2. 02Release empty container: Equipment releases empty containers at the depot.
  3. 03Loading at the shipper and export declaration run in parallel.
  4. 04Shipper loads, truck delivers: The shipper loads, trucks bring the containers.
  5. 05Export declaration to customs: Customs releases the goods for export.
  6. 06Containers here, customs done.
  7. 07Gate: entry: At the gate a camera reads the container number.
  8. 08Stacking in the yard: A gantry crane stacks the containers by ship and destination.
  9. 09Stowage plan: Stowage planning fixes where each box stands on board.
  10. 10Loading onto the ship: Ship-to-shore cranes load the ship. If it is full, the rest rolls to the next.
  11. 11Bill of lading: The bill of lading goes to the shipper.
  12. 12On board.

A ship calls (including other lines)

  1. 01Pre-arrival notification: The agent reports arrival, crew and dangerous goods via the single window.
  2. 02Allocate berth: The terminal allocates berth and time window.
  3. 03Pilot aboard, river passage: A pilot boards and guides the ship through the fairway.
  4. 04Tugs and mooring: Tugs push the ship alongside, linesmen fix the lines.
  5. 05Discharging and loading at berth: Cranes discharge and load around the clock.
  6. 06Departure with pilot: Out again with pilot and tugs.
  7. 07Settle port dues: The port authority invoices port dues.
  8. 08Departed.

An import container goes inland

  1. 01Discharge and stack: Ten containers come off the ship into the yard.
  2. 02Arrival notice: Customer service notifies the consignee.
  3. 03Customs clearance and release run in parallel.
  4. 04Customs clearance: Customs checks the declaration and decides: release or inspection.
  5. 05Release (freight paid): The line releases once freight is paid.
  6. 06Released.
  7. 07Onward by truck, rail or to inspection: Truck or block train – or has customs ordered an inspection?
  8. 08Inspection at the scanner: The container goes through the scanner.
  9. 09Slot with the trucker: The trucker books a time slot.
  10. 10Gate: exit: At the gate: check and handover.
  11. 11Block train inland: Gantry cranes load the box onto a block train.
  12. 12Empty back to the depot: The consignee returns the empty box to the depot.
  13. 13Delivered.

How a shipping line or terminal can use the model

  • Internal communication

    The collaboration view shows shipping line and terminal as two companies in one process: booking, equipment and stowage planning on one side, gate, yard and quay operations on the other.

    For whomBoard, terminal management, internal comms

  • Onboarding

    ‘The path across the site’ takes newcomers along with an export container from the gate through the yard to the quay crane and the rail terminal.

    For whomNew staff in terminal and documentation

  • Training

    The disruption ‘Terminal system fails’ stops gate, yard and berth planning for four hours. Trainees watch trucks, boxes and ships back up – and then drain away.

    For whomPort trainees, terminal shift leads

  • Explaining to customers

    Show shippers and forwarders the schedule as a rhythm: three departures a week. Miss one, and the box waits for days.

    For whomSales and booking, customer service, forwarders

  • Strategic overview

    Three, four or six cranes per ship, more rail inland, larger ships: ‘What each control does’ ranks investments and contracts.

    For whomManagement, planning, berth planning

Diagrams from the model

07

Diagrams from the model

‘Who works with whom’ as a dome of arcs – one of 14 diagrams calculated live from the same data.

The whole software

08

The whole software

Situation, key figure, time-lapse, six views, controls and disruptions: one click on a department shows its task, location and all relations.

What you can change

Controls

  • Cargo volume: Before the holidays in Europe everyone wants to ship at once.
  • Slots per departure: How many boxes this port may load per departure.
  • Cranes per ship: More cranes, shorter time at berth – and higher cost.
  • Rail share inland: More block trains relieve the gate.

Disruptions

  • Storm closes the fairway: For a day pilotage and mooring take three times as long; ships bunch up.
  • Terminal system fails: For four hours gate, yard and berth planning stand still.
  • Strike at the terminal: For a day only a third of the cranes work.
  • Delayed ships arrive bunched: For two days three times as many ships arrive.

What the model gives a shipping line

  • 01

    The port as a stage

    Berths, container yards and gate stand as a walkable 3D site. You see the pressure exactly where it builds up.

  • 02

    Delays in advance

    The simulation models queues. Three times as many ships for two days show in ‘Where the site gets tight’ where the quay fills up first.

  • 03

    Truck versus rail

    The process ‘An import container goes inland’ shows truck, rail and inspection. The ‘Rail share inland’ control shows how block trains relieve the gate.

  • 04

    Storm, strike, system failure

    Four disruptions can be triggered, from a closed fairway to a strike in which only a third of the cranes work.

  • 05

    Brought to life by your data

    Real ship arrivals, yard occupancy and gate waiting times turn the example into your own terminal.

  • NORDHAFT GRUPPE in the morning – low sun, long shadows, the first commuters on their way in.
    NORDHAFT GRUPPE in the morning – low sun, long shadows, the first commuters on their way in.
  • 9 buildings, 16 departments, about 1,700 staff: in the evening light golden arcs show who reports to whom.
    Shipping line headquarters in evening light – golden arcs show who reports to whom.
  • Just before eight – people stream from the car park and the street into the buildings.
    Just before eight – people stream from the car park and the street into the buildings.
  • Blue hour – the windows of NORDHAFT GRUPPE light up.
    Blue hour – the windows of NORDHAFT GRUPPE light up.
  • At night from above – Shipping line headquarters opened up, data lines glowing across the site.
    At night from above – Shipping line headquarters opened up, data lines glowing across the site.
  • Shipping line headquarters opened up – every floor with workplaces and people.
    Shipping line headquarters opened up – every floor with workplaces and people.
  • Dusk, performance view – rings of light show how busy each department is.
    Dusk, performance view – rings of light show how busy each department is.
  • Looking into the floor of Berth and vessel planning – rows of desks, the floors above as outlines of light.
    Looking into the floor of Berth and vessel planning – rows of desks, the floors above as outlines of light.
  • Every building can be opened, floor by floor – right into single rooms such as ‘Group board’, with workplaces and people at work.
    A room of its own – Group board.
  • Terminal control centre opened up – every floor with workplaces and people.
    Terminal control centre opened up – every floor with workplaces and people.
  • Container yard West – all floors at once, performance view.
    Container yard West – all floors at once, performance view.
  • Structure at dusk – golden arcs from every floor to the buildings reporting to it.
    Structure at dusk – golden arcs from every floor to the buildings reporting to it.
  • ‘Berth and vessel planning’ with all 5 relations: Stowage planning and Network planning – and outside Port authority, Pilots' association and Tugs and mooring.
    Collaboration – Berth and vessel planning with all 5 relations – to departments, buildings and partners.
  • Data flows at night – systems and users linked by glowing lines.
    Data flows at night – systems and users linked by glowing lines.
  • Data flows at dusk – which department uses which system.
    Data flows at dusk – which department uses which system.
  • Structure across the whole site – reporting lines between the buildings.
    Structure across the whole site – reporting lines between the buildings.
  • The whole network at night – collaboration inside and far beyond.
    The whole network at night – collaboration inside and far beyond.
  • A single case can be followed – step by step, with the waiting time at every station. Target: loaded within 5 days of booking.
    Every step labelled – name, how many are waiting, utilisation.
  • Following one case – ‘An export container goes on board’ – step by step through the building.
    Following one case – ‘An export container goes on board’ – step by step through the building.
  • Delayed ships arrive bunched – resources view, the backlog grows floor by floor.
    Delayed ships arrive bunched – resources view, the backlog grows floor by floor.
  • The data arcs turn red and work stalls – the simulation shows where cases pile up and how long recovery takes.
    Terminal system fails – the data arcs turn red, work stalls.
  • The lever – Slots per departure set to ‘large ship’ – a flash shows where it acts.
    The lever – Slots per departure set to ‘large ship’ – a flash shows where it acts.
  • Spring at NORDHAFT GRUPPE – Shipping line headquarters opened up, rings show the workload.
    Spring at NORDHAFT GRUPPE – Shipping line headquarters opened up, rings show the workload.
  • Summer evening – warm light, long shadows, golden arcs above the square.
    Summer evening – warm light, long shadows, golden arcs above the square.
  • Autumn – leaves on the paths, performance view.
    Autumn – leaves on the paths, performance view.
  • Winter evening – snow on the site, Shipping line headquarters open and lit, collaboration glowing.
    Winter evening – snow on the site, Shipping line headquarters open and lit, collaboration glowing.
  • ‘Who works with whom’ as a dome of arcs – one of 14 diagrams calculated live from the same data.
    Diagram ‘Who works with whom’, calculated live from the model.
  • Diagram ‘Year, week, day’, calculated live from the model.
    Diagram ‘Year, week, day’, calculated live from the model.
  • Diagram ‘Management levels as a staircase’, calculated live from the model.
    Diagram ‘Management levels as a staircase’, calculated live from the model.
  • Diagram ‘How a case flows’, calculated live from the model.
    Diagram ‘How a case flows’, calculated live from the model.
  • Diagram ‘What each control does’, calculated live from the model.
    Diagram ‘What each control does’, calculated live from the model.
  • Diagram ‘What the work depends on’, calculated live from the model.
    Diagram ‘What the work depends on’, calculated live from the model.
  • Diagram ‘Where it gets tight’, calculated live from the model.
    Diagram ‘Where it gets tight’, calculated live from the model.
  • Diagram ‘Who leads whom’, calculated live from the model.
    Diagram ‘Who leads whom’, calculated live from the model.
  • The whole software – situation, key figure, time, views and the controls below.
    The whole software – situation, key figure, time, views and the controls below.
  • Shipping line headquarters selected – floor list on the right, the floors drift apart.
    Shipping line headquarters selected – floor list on the right, the floors drift apart.
  • Situation, key figure, time-lapse, six views, controls and disruptions: one click on a department shows its task, location and all relations.
    Berth and vessel planning – card with task, location and all relations.
  • Delayed ships arrive bunched triggered – timeline, key figure and bottleneck react.
    Delayed ships arrive bunched triggered – timeline, key figure and bottleneck react.
  • Countering – Slots per departure increased – the tile shows the effect since the change.
    Countering – Slots per departure increased – the tile shows the effect since the change.
  • Diagram ‘How a case flows’ with its panel – findings in sentences.
    Diagram ‘How a case flows’ with its panel – findings in sentences.
  • Diagram ‘Who works with whom’ with its panel.
    Diagram ‘Who works with whom’ with its panel.
  • Follow a case – step, waiting time and target on the card.
    Follow a case – step, waiting time and target on the card.
  • The tour leads through the software in eight steps.
    The tour leads through the software in eight steps.
  • 36 organisations to choose from, each with its own picture.
    36 organisations to choose from, each with its own picture.

Your port as a model

Would you like to see your terminal, berths or hinterland traffic like this? Contact us by email or phone and we'll discuss which terminal and booking data the model needs. You can also ask us for the password to try it yourself.

Request the password if you are interested →

Ask about this

Minimal Organization: Reederei

What you enter goes to this site alone and serves only to answer you.

Basis and limits

Fictional shipping line · model based on researched industry structures · no forecast for real companies

1 case = 10 containers or 1 ship · 1 figure ≈ 25 employees

All volumes, durations, rates and capacities are model assumptions, not values of a real line or terminal.

Three departures per week with fixed slots are simplified; real services allocate per customer and alliance.

Documented: terminal as a separate company, pilots under public law, customs decides on release and inspection, notifications via the single window.

Public sources the model is based on:

  • Aufgaben einer Hafenbehörde (Beispiel)
  • Gesetz über das Seelotswesen
  • EU Maritime Single Window, VO (EU) 2019/1239
  • IMO Just-in-Time Arrival Guide
  • UNCTAD Review of Maritime Transport

Similar business models

← Minimal Organization

All data are fictional – NORDHAFT GRUPPE does not exist. The model can be fitted to your port's real data and filled with what few people see side by side today: ship arrivals and time at berth, or yard occupancy per block and hour.