Skip to content
cube4devcube4dev

Simulation · Minimal Organization · Logistics and transport

Freight forwarder

A freight forwarder as a walkable model: groupage, ocean and air freight, cross-docking and customs in a running simulation.

Trailer

All data are fictional – KAVELON LOGISTIK does not exist. The model can be fitted to your real data and then shows what is locked in separate systems today: shipment data per lane and line haul, or customs status and inspection rate per shipment.

The groupage freight process at a forwarder, as a running model. KAVELON LOGISTIK is fictional and, like many forwarders, hardly drives itself: it buys space from carriers, cross-docks the goods and holds the chain together with data and customs. The main process shows a groupage (LTL) shipment from pick-up and cross-docking onto destination lanes to the line haul at 8 pm. Miss it, and the shipment waits until the next evening.

The site holds the head office, the cross-dock terminal, a contract logistics warehouse and a truck and container yard. Alongside, a container travels from Asia and an air freight shipment goes overseas. A diversion around the Cape stretches the sea voyage by a third for a month. With authorised economic operator (AEO) status, customs inspects less often.

Customs inspection rates and sea transit times are model assumptions. Documented in the sources: forwarders mostly work with third-party carriers, and customs decides on release. This page is for senior management, dispatch, cross-dock operations, customs, sales and customer service.

A groupage shipment travels the network

  1. 01

    Road dispatch: A customer releases two pallets for shipping; dispatch plans the pick-up.

  2. 02

    Pick-up at shipper: A haulier collects the goods.

  3. 03

    Cross-dock inbound: In the evening the cross-dock unloads the pick-up trucks.

  4. 04

    Cross-docking to lanes: Pallets are placed on the lanes of their destination region.

  5. 05

    Line haul (8 pm): At 8 pm the line hauls leave.

  6. 06

    Network partner at destination: A partner forwarder in the destination area takes over.

  7. 07

    Delivery to consignee: Delivery to the consignee.

  8. 08

    Delivered.

A site at work

01

A site at work

4 buildings, 11 departments, about 810 staff: in the evening light golden arcs show who reports to whom.

Every floor opened up

02

Every floor opened up

Every building can be opened, floor by floor – right into single rooms such as ‘Customs brokerage’, with workplaces and people at work.

What is shown – why – for whom

What is shown Why For whom
Diagram ‘Year, week, day’: pick-up, cross-docking, line haul at 8 pm WhyExplains the day of a groupage shipment. For whomDispatch, customers
Diagram ‘Who works with whom’: shipping lines, airlines, customs, network partners WhyShows how little the forwarder drives itself. For whomSales, induction of new teams
Diagram ‘Where the time goes’: sea voyage, customs, cross-docking WhyShows where a shipment loses days. For whomCustomer service, ocean freight
Diagram ‘What each control does’: AEO status, customs team, cross-dock staff WhyRanks the levers for faster clearance. For whomSenior management, customs
Diagram ‘The path across the site’: cross-dock, contract warehouse, truck yard WhyShows the routes on site. For whomSite management
Resources view in the cross-dock terminal in the evening WhyShows whether the line haul fills up. For whomShift leads
Disruption ‘Diversion around the Cape’ WhyShows how one strait lengthens the supply chain. For whomCustomers, sales
Who works with whom

03

Who works with whom

‘Procurement and rates’ with all 5 relations: Sales and Finance – and outside Shipping line and container terminal, Airline and cargo handling and Trucking companies.

A groupage shipment travels the network

04

A groupage shipment travels the network

A single case can be followed – step by step, with the waiting time at every station. Target: at the consignee within 48 hours.

Films from the model

  • The building opens up

    Just before sunset the floors drift apart – ‘Head office’ opens up as the camera rises and circles the building until night falls.

  • Who reports to whom, who works with whom

    Blue hour above the site: first the golden arcs of the structure, then the collaboration of the most connected department, finally the whole building.

  • A day in time-lapse

    From ten in the morning to midnight in 26 seconds: the sun moves, the windows light up, at night the data lines glow.

  • Surge and disruption

    In time-lapse: ‘Customs IT outage’ brings more work, then ‘Diversion around the Cape’. The control ‘Cross-dock staff’ set to ‘extra shift’ brings recovery.

  • Seven diagrams

    Calculated live from the model: ‘Who works with whom’, ‘Year, week, day’, ‘Management levels as a staircase’, ‘How a case flows’, ‘What each control does’, ‘What the work depends on’, ‘Where it gets tight’.

  • Using the software

    With the full interface: open a building, a department’s relations, ‘Customs IT outage’, a control, diagrams with their panel, one case.

Departments in the model

  • Management

    Leads the modes of transport and country stations.

  • Finance

    Assigns every bill to a shipment: margin = sale minus purchase.

  • Quality and compliance

    Checks customs procedures, air security and sanctions lists.

  • Sales

    Wins customers and answers tenders.

  • Procurement and rates

    Buys capacity from shipping lines, airlines and hauliers.

  • Ocean freight

    Books containers, tracks ships, organises pre- and on-carriage.

  • Air freight

    Consolidates shipments and hands them to the airline.

  • Road freight

    Dispatches pick-up, line haul and delivery in the groupage network.

  • Customs brokerage

    Files imports and exports with customs – on behalf of the customer.

  • Cross-dock

    Unloads pick-up trucks in the evening and loads trucks to the other regions.

  • Contract logistics

    Stores and picks for customers on their account.

Customs IT outage

05

Customs IT outage

The backlog grows floor by floor – the simulation shows where it gets tight and which control helps.

06

A day in 26 seconds

From ten in the morning to midnight in time-lapse: commuters, moving light, windows switching on – and at night the data lines.

All processes in the model

A groupage shipment travels the network

  1. 01Road dispatch: A customer releases two pallets for shipping; dispatch plans the pick-up.
  2. 02Pick-up at shipper: A haulier collects the goods.
  3. 03Cross-dock inbound: In the evening the cross-dock unloads the pick-up trucks.
  4. 04Cross-docking to lanes: Pallets are placed on the lanes of their destination region.
  5. 05Line haul (8 pm): At 8 pm the line hauls leave.
  6. 06Network partner at destination: A partner forwarder in the destination area takes over.
  7. 07Delivery to consignee: Delivery to the consignee.
  8. 08Delivered.

A container comes from Asia

  1. 01Ocean booking: Ocean freight books a container for an importer.
  2. 02Slot at the shipping line: The shipping line confirms a slot on a ship.
  3. 03Ocean transport: Weeks at sea – Asia to northern Europe.
  4. 04Arrival: customs declaration and carrier release run at the same time.
  5. 05Customs declaration: The customs team files the shipment electronically (ATLAS).
  6. 06Customs decision: Customs checks by risk: release or inspect.
  7. 07Customs inspection: Inspection: customs opens the container.
  8. 08Carrier release and terminal slot: Freight paid, carrier releases, terminal slot booked.
  9. 09Customs and release are in place.
  10. 10On-carriage by truck: A truck brings the container to the warehouse.
  11. 11Put-away contract logistics: Contract logistics puts the goods away for the customer.
  12. 12Stored.

An air freight shipment goes overseas

  1. 01Air booking: Air freight books an urgent spare parts shipment.
  2. 02Pick-up at shipper: Pick-up at the customer.
  3. 03Air freight handling: Acceptance at air freight handling.
  4. 04Security screening: X-ray: only secure cargo may enter the aircraft.
  5. 05Second screening: repeat X-ray: Unclear image: second check.
  6. 06Export declaration and consolidation at the same time.
  7. 07Customs declaration: The customs team files the shipment electronically (ATLAS).
  8. 08Customs decision: Customs checks by risk: release or inspect.
  9. 09Customs inspection: Inspection: customs opens the container.
  10. 10Consolidation: Many shipments are bundled into one consolidation.
  11. 11Export and consolidation done.
  12. 12Handover to airline (9 pm): At 9 pm the forwarder hands over to the airline's cargo handling.
  13. 13Flight: Flight in an airline's cargo hold.
  14. 14Deconsolidation at destination: The own overseas station breaks down the consolidation.
  15. 15Arrived.

How a freight forwarder can use the model

  • Internal communication

    ‘Who works with whom’ shows network partners, customs, shipping lines and airlines around the head office, so every department sees how much the forwarder achieves together with others.

    For whomSenior management, internal comms

  • Onboarding

    New colleagues in sales and dispatch see how little the forwarder drives itself and who takes over a shipment between pick-up and delivery.

    For whomSales, dispatch, new staff

  • Training

    Trainees play through the driver shortage: for three days pick-ups and on-carriage take almost twice as long. The resources view shows whether the 8 pm line haul still fills up.

    For whomForwarding and cross-dock trainees, shift leads

  • Explaining to customers

    Show shippers where a shipment loses days: sea voyage, customs, cross-docking. The diversion around the Cape shows how one strait lengthens the supply chain.

    For whomCustomer service, ocean freight, sales, shippers

  • Strategic overview

    AEO status, a larger customs team or an extra cross-dock shift? ‘What each control does’ ranks the levers for faster clearance.

    For whomSenior management, customs, site management

Diagrams from the model

07

Diagrams from the model

‘Who works with whom’ as a dome of arcs – one of 14 diagrams calculated live from the same data.

The whole software

08

The whole software

Situation, key figure, time-lapse, six views, controls and disruptions: one click on a department shows its task, location and all relations.

What you can change

Controls

  • Shipment volume: More orders across all modes.
  • Cross-dock staff: How many crews cross-dock in the evening.
  • Customs team: How many declarations are handled at once.
  • Authorised economic operator: With AEO status customs inspects less often.
  • Line-haul trucks: How many shipments can leave at 8 pm.

Disruptions

  • Customs IT outage: Eight hours without electronic filing: customs works slowly, containers wait in port.
  • Diversion around the Cape: Ships avoid a strait: for a month the voyage takes a third longer.
  • Driver shortage: For three days truck drivers are missing: pick-ups and on-carriage take almost twice as long.

What the model gives a freight forwarder

  • 01

    A network, not a fleet

    The model shows what makes a forwarder: other carriers' space, its own data, its own customs team. Customers and new teams see it by walking through the site.

  • 02

    The day of a groupage shipment

    Pick up by day, cross-dock in the evening, leave at 8 pm: ‘Year, week, day’ shows the rhythm, the simulation the queue in front of it.

  • 03

    Three modes in one model

    Groupage overnight, containers over weeks, air freight in days: all three processes run at the same time on the same site.

  • 04

    Customs as a lever

    Controls for the customs team and AEO status show how release gets faster; the disruption ‘Customs IT outage’ shows what happens without electronic filing.

  • 05

    For customer meetings and big screens

    Walkable in the browser and on large projections, with a guided tour on first start.

  • KAVELON LOGISTIK in the morning – low sun, long shadows, the first commuters on their way in.
    KAVELON LOGISTIK in the morning – low sun, long shadows, the first commuters on their way in.
  • 4 buildings, 11 departments, about 810 staff: in the evening light golden arcs show who reports to whom.
    Head office in evening light – golden arcs show who reports to whom.
  • Just before eight – people stream from the car park and the street into the buildings.
    Just before eight – people stream from the car park and the street into the buildings.
  • Blue hour – the windows of KAVELON LOGISTIK light up.
    Blue hour – the windows of KAVELON LOGISTIK light up.
  • At night from above – Head office opened up, data lines glowing across the site.
    At night from above – Head office opened up, data lines glowing across the site.
  • Head office opened up – every floor with workplaces and people.
    Head office opened up – every floor with workplaces and people.
  • Dusk, performance view – rings of light show how busy each department is.
    Dusk, performance view – rings of light show how busy each department is.
  • Looking into the floor of Procurement and rates – rows of desks, the floors above as outlines of light.
    Looking into the floor of Procurement and rates – rows of desks, the floors above as outlines of light.
  • Every building can be opened, floor by floor – right into single rooms such as ‘Customs brokerage’, with workplaces and people at work.
    A room of its own – Customs brokerage.
  • Truck and container yard opened up – every floor with workplaces and people.
    Truck and container yard opened up – every floor with workplaces and people.
  • Contract logistics warehouse – all floors at once, performance view.
    Contract logistics warehouse – all floors at once, performance view.
  • Structure at dusk – golden arcs from every floor to the buildings reporting to it.
    Structure at dusk – golden arcs from every floor to the buildings reporting to it.
  • ‘Procurement and rates’ with all 5 relations: Sales and Finance – and outside Shipping line and container terminal, Airline and cargo handling and Trucking companies.
    Collaboration – Procurement and rates with all 5 relations – to departments, buildings and partners.
  • Data flows at night – systems and users linked by glowing lines.
    Data flows at night – systems and users linked by glowing lines.
  • Data flows at dusk – which department uses which system.
    Data flows at dusk – which department uses which system.
  • Structure across the whole site – reporting lines between the buildings.
    Structure across the whole site – reporting lines between the buildings.
  • The whole network at night – collaboration inside and far beyond.
    The whole network at night – collaboration inside and far beyond.
  • A single case can be followed – step by step, with the waiting time at every station. Target: at the consignee within 48 hours.
    Every step labelled – name, how many are waiting, utilisation.
  • Following one case – ‘A groupage shipment travels the network’ – step by step through the building.
    Following one case – ‘A groupage shipment travels the network’ – step by step through the building.
  • The backlog grows floor by floor – the simulation shows where it gets tight and which control helps.
    Customs IT outage – resources view, the backlog grows floor by floor.
  • The lever – Cross-dock staff set to ‘extra shift’ – a flash shows where it acts.
    The lever – Cross-dock staff set to ‘extra shift’ – a flash shows where it acts.
  • Spring at KAVELON LOGISTIK – Head office opened up, rings show the workload.
    Spring at KAVELON LOGISTIK – Head office opened up, rings show the workload.
  • Summer evening – warm light, long shadows, golden arcs above the square.
    Summer evening – warm light, long shadows, golden arcs above the square.
  • Autumn – leaves on the paths, performance view.
    Autumn – leaves on the paths, performance view.
  • Winter evening – snow on the site, Head office open and lit, collaboration glowing.
    Winter evening – snow on the site, Head office open and lit, collaboration glowing.
  • ‘Who works with whom’ as a dome of arcs – one of 14 diagrams calculated live from the same data.
    Diagram ‘Who works with whom’, calculated live from the model.
  • Diagram ‘Year, week, day’, calculated live from the model.
    Diagram ‘Year, week, day’, calculated live from the model.
  • Diagram ‘Management levels as a staircase’, calculated live from the model.
    Diagram ‘Management levels as a staircase’, calculated live from the model.
  • Diagram ‘How a case flows’, calculated live from the model.
    Diagram ‘How a case flows’, calculated live from the model.
  • Diagram ‘What each control does’, calculated live from the model.
    Diagram ‘What each control does’, calculated live from the model.
  • Diagram ‘What the work depends on’, calculated live from the model.
    Diagram ‘What the work depends on’, calculated live from the model.
  • Diagram ‘Where it gets tight’, calculated live from the model.
    Diagram ‘Where it gets tight’, calculated live from the model.
  • Diagram ‘Who leads whom’, calculated live from the model.
    Diagram ‘Who leads whom’, calculated live from the model.
  • The whole software – situation, key figure, time, views and the controls below.
    The whole software – situation, key figure, time, views and the controls below.
  • Head office selected – floor list on the right, the floors drift apart.
    Head office selected – floor list on the right, the floors drift apart.
  • Situation, key figure, time-lapse, six views, controls and disruptions: one click on a department shows its task, location and all relations.
    Procurement and rates – card with task, location and all relations.
  • Customs IT outage triggered – timeline, key figure and bottleneck react.
    Customs IT outage triggered – timeline, key figure and bottleneck react.
  • Countering – Cross-dock staff increased – the tile shows the effect since the change.
    Countering – Cross-dock staff increased – the tile shows the effect since the change.
  • Diagram ‘How a case flows’ with its panel – findings in sentences.
    Diagram ‘How a case flows’ with its panel – findings in sentences.
  • Diagram ‘Who works with whom’ with its panel.
    Diagram ‘Who works with whom’ with its panel.
  • Follow a case – step, waiting time and target on the card.
    Follow a case – step, waiting time and target on the card.
  • The tour leads through the software in eight steps.
    The tour leads through the software in eight steps.
  • 36 organisations to choose from, each with its own picture.
    36 organisations to choose from, each with its own picture.

Your forwarding business as a model

Would you like to see your cross-dock, lanes or customs clearance like this? Write or phone us and we'll work out which transport management and customs data the model needs. We'll send you the password on request.

Request the password if you are interested →

Ask about this

Minimal Organization: Spedition

What you enter goes to this site alone and serves only to answer you.

Basis and limits

Fictional freight forwarder · model based on researched industry structures · no forecast for real companies

1 case = 10 groupage shipments, 1 container or 1 air shipment · 1 figure ≈ 15 employees

All volumes, durations, rates and capacities are model assumptions, not values of a real forwarder.

Inspection rate and ocean transit times: model assumptions.

Documented: forwarders mostly use third-party carriers; customs decides on release; air security by approved agents.

Public sources the model is based on:

  • Zoll: ATLAS
  • Unionszollkodex VO (EU) 952/2013
  • Luftfahrt-Bundesamt: Reglementierte Beauftragte
  • DSLV: ADSp

Similar business models

← Minimal Organization

All data are fictional – KAVELON LOGISTIK does not exist. The model can be fitted to your real data and then shows what is locked in separate systems today: shipment data per lane and line haul, or customs status and inspection rate per shipment.