Simulation · Minimal Logistik · Seaports
Hamburg · Container Terminal Altenwerder
An automated container terminal as a walkable model: up to 14 container gantries, driverless transport vehicles, the block yard, a rail station for trains up to 740 m and the truck gate.
Real are the location, terrain and buildings (official elevation data, OpenStreetMap) and the site profile figures. Volumes, rhythms and vehicle numbers are model assumptions, processes accelerated. With your data, the model shows what is scattered today: time at berth, fill per block, gate waits.
The container terminal at Hamburg-Altenwerder as a running model: container giants up to 400 m berth, and up to 14 container gantries move the boxes, each in about two minutes. Driverless transport vehicles carry them into the block yard, whose fill level follows the port’s stock in the model. From the terminal’s rail station, container trains up to 740 m head inland; the rest leaves by truck through the gate.
About half of the hinterland traffic reaches Hamburg by rail. In the model, 57 % of the volume goes by rail and 41 % by road, three quarters of it container goods. A port strike, storm and fog hit this site hardest: ships wait at anchor, the yard fills up, trucks queue at the gate. You can ride along with a ship, a train or a truck. The supply chain to Munich starts here, too: 40 to 50 containers on one train, south via the Lehrte MegaHub.
Real are the location, terrain and buildings, taken from official Hamburg elevation data and OpenStreetMap, and the figures in the site profile, taken from public information. Daily volumes, rhythms and vehicle numbers are model assumptions in the right order of magnitude; processes run accelerated. This page is for terminal operations and planning, the port industry, forwarders, local authorities and chambers, schools, universities and exhibitions.
A ship in port (riding along, key F)
- 01
waiting at anchor
- 02
coming in
- 03
at the quay: being unloaded and loaded
- 04
leaving
What is shown – why – for whom
| What is shown | Why | For whom |
|---|---|---|
| Container gantries at the quay: up to 14 per container giant | WhyShows where handling begins. | For whomTerminal operations, teaching |
| Block yard with driverless transport vehicles, fill level = port stock | WhyShows when the yard fills up. | For whomTerminal planning |
| Terminal rail station: container trains up to 740 m | WhyShows the rail route inland. | For whomRail logistics, local authorities |
| Truck gate with tailback | WhyShows when the gate is no longer enough. | For whomForwarders, terminal management |
| Riding along with ship, train and truck | WhyExplains every step in one line. | For whomOnboarding, training |
| Scenario ‘Port strike’, storm and fog | WhyShows how vulnerable the port is. | For whomPort industry, the public |
| Supply chain ‘Containers Hamburg → Munich’ | WhyLinks the port with the south. | For whomEconomic development, exhibitions |
Facilities and areas in the model
-
Container gantries
Up to 14 gantries unload a container giant; each moves a box in about two minutes (accelerated here).
-
Container yard
Block yard: fill level = stock of the port in the model.
-
Terminal rail station
Container trains up to 740 m are loaded inside the terminal: about half of the hinterland traffic goes by rail.
-
Truck gate
Gate check-in: if more trucks arrive than the gate can handle, a queue forms.
Processes in the model
A ship in port (riding along, key F)
- 01waiting at anchor
- 02coming in
- 03at the quay: being unloaded and loaded
- 04leaving
A train in the terminal (riding along, key F)
- 01arriving
- 02being loaded
- 03departing
A truck at the gate (riding along, key F)
- 01driving to the gate
- 02check-in at the gate
- 03driving to the loading point
- 04being loaded
- 05leaving
Supply chain ‘Containers Hamburg → Munich’ (passes through this site)
- 01Hamburg: containers from overseas are loaded onto a train heading south
- 02At the terminal station the train is loaded – forty to fifty containers
- 03By rail to Lehrte near Hanover, about 180 km
- 04Lehrte MegaHub: gantry cranes lift containers from train to train – no shunting
- 05Beneath the cranes driverless transporters carry the box to its new train
- 06On another train to Munich. The chain is an example (model)
Try the scenario ‘Port strike’
- 01tap it in the deck
- 02vehicles, yards and traffic-light rings at the site react at once
- 03time 4× shows how it develops
- 04‘Back to today’
How a container terminal can use the model
-
Operations and planning
Economy, consumption, industry and tolls can all be adjusted. Expensive roads shift freight to rail; where 41 % travels by truck today, yard, tracks and gate show at once what that means.
For whomTerminal management, planning, port industry
-
Onboarding and training
Ride along with key F: the camera follows a ship from the anchorage to the quay, a train through the terminal station or a truck from the gate to the loading point. One line says what is happening.
For whomNew staff, port trainees
-
Local authorities and economic development
The supply chain ‘Containers Hamburg → Munich’ shows how a box from overseas travels south via Lehrte – and what the port does for its hinterland.
For whomLocal authorities, economic development, chambers
-
Schools, universities, museums
How does an automated container terminal work? Gantry, driverless vehicle, block yard and railway stand side by side, and the demo runs without anyone at the controls.
For whomSchools, universities, museums and exhibitions
-
Public communication
The ‘Port strike’ scenario shows at four times the speed how ships wait at anchor and containers pile up – and one tap takes you back to today.
For whomPublic relations, associations, port industry
What you can change
Controls
- Economy: How much is produced and traded overall. Acts on all flows of Hamburg-Altenwerder.
- Consumer demand: Container goods and food for retail. Weight here about 61 % of the volume.
- Industrial output: Raw materials, steel, parts, chemicals. Weight here about 39 % of the volume.
- Transport cost / tolls: Expensive roads shift freight to rail and water. Here 41 % of the volume goes by road.
- Season: Spring: more building materials and seed, raw materials +8 %, food +5 %. Autumn: harvest (food +18 %), Christmas run-up (containers +8 %), first heating oil deliveries. Winter: heating oil and Christmas trade, less road capacity.
Disruptions
- Disruption: Motorway: One lane remains, the detour loads the neighbouring routes.
- Disruption: Rail strike: Freight trains stand still, trucks and ships take over part, stocks pile up.
- Disruption: Port strike (hits this site hardest): Hardly any handling, ships wait at anchor, containers pile up.
- Extreme weather: Storm, fog (hits this site hardest): Cranes in the seaports stop, ships wait, motorways slower.
- Extreme weather: Snow and ice: Bottlenecks overloaded, canals partly frozen.
What the model gives a container terminal
-
01
The real site as a stage
Quay, yard, rail station and gate stand on terrain built from official elevation data. You show the terminal as it lies, not as a diagram.
-
02
One port, three routes
Ship, rail and truck run at the same time. The site profile shows every part of the terminal with live values.
-
03
Disruptions without damage
Trigger a port strike, storm, rail strike or ice, see where it gets tight first, then return to today.
-
04
Site and map in one model
The block yard’s fill level follows the port’s stock on the Germany map. What happens in the network arrives at the quay.
-
05
For port visits and big screens
Runs in the browser and on large projections, with a demo that starts without anyone at the controls.
Your terminal as a model
Would you like to see your quay, yard or hinterland traffic like this? Write or call us and we'll work out which terminal and rail planning data the model needs. We'll send you the password on request.
cube4tec.de/spiele/minimal-logistik/
Ask about this
Minimal Logistik: Hamburg · Container Terminal Altenwerder
Basis and limits
Real are the location, terrain and buildings of Hamburg-Altenwerder (official Hamburg elevation data and OpenStreetMap) and the figures in the site profile, taken from public information. Daily volumes, rhythms and vehicle numbers are model assumptions in the right order of magnitude; processes run accelerated.
Public sources the model is based on:
- OpenStreetMap contributors: map data (ODbL 1.0)
- OpenFreeMap / OpenMapTiles: vector tiles
- Free and Hanseatic City of Hamburg, LGV: DGM1 and bDOM 2022 (dl-de/by-2.0)
- Port of Hamburg: throughput figures 2025 at a glance
- Port of Hamburg: hinterland rail freight of German container ports grows
- Federal Statistical Office: freight transport by mode
- German Environment Agency: freight emission data 2024 (g CO₂e per tonne-kilometre)
More places in the model
-
Bremerhaven · car terminal and river quay
Bremerhaven as a walkable model: almost five kilometres of river quay for the largest container ships, straddle carriers, car trains and parking for about 95,000 vehicles at the mouth of the Weser.
-
Wilhelmshaven · JadeWeserPort and LNG terminal
Germany’s only deep-water port as a walkable model: the container quay on the Jade with straddle carriers and rail, plus the floating LNG terminal, a tank farm and the crude-oil pipeline to the refineries.
-
Lehrte · MegaHub
A train-to-train transfer facility as a walkable model: six tracks of 720 m each, three gantry cranes, driverless transporters – and freight trains regrouped without shunting.
-
Munich · Riem transhipment station
The transhipment station in the east of Munich as a walkable model: container trains from Hamburg, Bremerhaven and Italy, gantry cranes between train, yard and truck, and the A94 next door.
-
Großbeeren · freight village Berlin South
The freight village on the Berlin ring as a walkable model: distribution centres for retail and food, an intermodal terminal for goods from Hamburg, and the expressway the capital’s supply depends on.
-
Germany · freight flows and nodes
All of Germany as a map of blocks: 27 nodes, 55 freight flows as bands of light, eleven bottlenecks with traffic lights. Controls, seasons, disruptions and ten scenarios change every flow at once, compared with today.
-
Duisburg · logport I (Rheinhausen)
A trimodal inland port on the Rhine as a walkable model: Rhine barges with sea containers from Rotterdam, gantries and yard, trains to the south, Eastern Europe and Asia, trucks into the region.
-
Duisburg-Schwelgern · works harbour and blast furnaces
A raw-material chain as a walkable model: push convoys with ore and coal from Rotterdam, grab unloaders, ore and coal stockyards, conveyor belts and the Schwelgern 1 and 2 blast furnaces.
Real are the location, terrain and buildings (official elevation data, OpenStreetMap) and the site profile figures. Volumes, rhythms and vehicle numbers are model assumptions, processes accelerated. With your data, the model shows what is scattered today: time at berth, fill per block, gate waits.